Donovan Payne Architects provided full architectural service from master planning through to contract administration.
Scope of Work
- The new pool is 51.25 metre x 8 lanes, with a 1.25 metre wide boom.
- This provides a 50 metre lap pool, two 25 metre lap pools, or a competition-sized water polo pool.
- The pool has been designed as a full FINA compliant competition pool, with concourse-level overflow gutters along both sides of its 51.25 metre length. It is a fully tiled, formed concrete pool, using fit-for-purpose DIN standard rating commercial pool-grade ceramic tiles.
- The project includes the following support facilities and amenities:
- Change rooms with WC, shower, basin and lockers
- Deck-side showers
- Accessible facility
- Entry/Office area
- Spectator seating under windbreak-sun shelter
- Plant room
- Pool storage
Project Outcomes
Finished on time and on budget.
As the reference on the following page explains, Donovan Payne Architects provided St Hilda’s with some advice pertaining to a tender process for procurement of the builders. The Davis Langdon pre-tender estimate was $6.8million. Rod Sproule of Perkins Builders, who was the successful tenderer for $5.5million, stated that the quality and clarity of our documentation contributed substantially to the very competitive tender results.
Naturally, the school is delighted to have saved around $1.5million in project costs. Donovan Payne Architects is very proud of this result.